Major Projects Awarded for Year 2002
- ConocoPhillips Belanak FPSO Project (and 2003 continuing to 2004) as MWS
- Total Indonesie Peciko Field Development Project Phase 4 (Contractor -
J.Ray McDermott) as MWS
- Total Indonesie Peciko Field Development Project Phase 4 Pipeline Backup
Lines Project EPSC 1 (Contractor - Saipem) as MWS
- Total Thailand Bongkot Field Development Phase 3C as MWS
- Nippon Steel Corporation - Transportation and Offshore facilities for 2002
(Various) as MWS
- Rang Dong Field Development Block 15-2 Offshore Vietnam Production
Facilities Well Head Platform WHP-E1 Topside as Engineering Consultant
- Talisman Malaysia as MWS for MOAB Deck Installation
- Impsa Malaysia - MWS and Engineering for Transportation of Container
Cranes from Cilegon, Indonesia to Colombo, Sri Lanka
- BSP Ampa/Fairley Rationalisation Project for 2002 (Contractor - Horizon
Offshore) as MWS
- SSB Phase 2 Project (Contractor - Global Offshore Malaysia Sdn Bhd) as MWS
for Pipeline Transportation
- SSB South Furious Structural/Pipeline and Barton Additional Gas Lift
Compressor Work (Contractor - Global Industries Asia Pacific) as MWS for
Pipeline Transportation, Loadout, Towage Approval and Offshore Lifting of
Structures and Engineering
- ConocoPhillips Block B Natuna Sea Pipeline, Flowlines and subsea equipment
for the Additional Dry Gas Field (ADGF) (Contractor - Saipem) as MWS for
Towage Approval and Engineering
- Clough-Unithai Engineering Ltd - UCU Phase 23 Platforms, Pipelines &
Tie-ins Installation Project as Warranty Surveyor for the installation of